Contact

Department:
Public Works
Project Manager: Bill Rademacher, City of Colorado Springs

George Hayward, Public Information

Key Dates

April 2022-Construction starts

All construction is dependent on weather and resources.

May 2023-Project completion

All construction is dependent on weather and resources.

Complete

 

Wooten Road at Platte Avenue is a minor arterial roadway within the City of Colorado Springs. The existing corrugated metal pipes used to carry stormwater under Wooten were placed in 1967. They do not meet current drainage criteria established to keep water from overflowing the road.

A new concrete box culvert will improve the drainage crossing and provide improved pedestrian access and traffic safety.  The project plans minimize the project’s footprint at Wooten Road and Platte Avenue and allows that intersection to remain open during construction.  

Key Elements

  • Improved vehicle and pedestrian safety
  • Improved stormwater drainage to reduce roadway flooding
  • Relocation of utilities and a sewer line beneath Wooten Road and Edison Avenue
  • Intersection of Platte and Wooten expected to remain open throughout construction
  • Temporary closure of Edison Avenue at Wooten

 

Funding

$2.9 million, PPRTA “A List” of projects 

Project Team

Engineering Design: AECOM
Construction Contractor: Blue Ridge Construction

 

 

 